|
||
![]() |
InsideOut has a keen interest in the interior design of a building. Our preference is to make a simple statement through the use of contrasting colour, and natural material selection. |
|
Victoria General Hospital Pediatrics Ward Construction Cost $1.2 million A 32 bed Pediatrics Ward fit-out at the Victoria General Hospital. Photo shows patient “Education Room” with feature floor design using marmoleum.
|
![]() |
|
Royal Jubilee Hospital Budget $350,000 A modular Nurse Station Design purpose-fitted to the specific program need at the new Diagnostic and Treatment Centre. 37 stations of varied design.
|
![]() |
|
Marion Hall, Shawnigan Lake School Construction Cost $3.7 million A 500-seat Dining Hall and Food Services facility. Includes extensive use of local timber and etched concrete floors. Donor for the project was the “larger-than-life” John Lecky.
|
![]() |
|
Prince Rupert Hospital Construction Cost $2.1 million Renovations to existing Hospital including Emergency Room, Intensive Car Unit, Day Surgery and new reception “control point.”
|
![]() |
|
Fort St. John Hospital Construction cost $7 million Alterations over 4 year period to Operating Room, Emergency, Intensive Care Unit, Day Surgery and Endoscopy. Photo shows views from Emergency Triage through to waiting room with children’s play area left.
|
![]() |
|
Palm Lodge Interior Design (Architectural design by another firm) for two dining/living areas for elderly residents suffering from dementia. Wall murals were used extensively throughout the project to disguise exits, and as a safe alternative to real objects.
|
![]() |
|